0

The Portuguese Navy (Marinha Portuguesa) first 1870 Tonnes and 83.10 meters long NPO ocean patrol vessel P360 NRP “Viana do Castelo´´ has arrived today at its homeport, the Base Naval de Lisboa (BNL). The vessel has leaved the shipbuilder ENVC SA facilities in April 26. The ship will remain in training during 1, 5 month until be considered fully operational with the naval surface fleet.

Post a Comment

Related Posts Plugin for WordPress, Blogger...
 
Top